Contract for the refurbishment of effluent water pipeline in Methoni WWTP has been signed on 9/15/2021
New contract for the O&M of Serres WWTP has been signed on 1/10/2022
1.98 MW
5.6 MW
5,4 MW
5.4 MW
6.9 MW
18 MW
63,000 tpa
124,000 m³/d