SERRES
WTP
The Treatment Plant is dimensioned for the treatment of 12,000 m³/d surface water and the production of drinking water
The installation consists of the following units.
-
Water pumping station
-
Flow measurement
-
Pre-disinfection - Rapid mixing
-
Filtration with 8 2-stage pressure filters
-
Storage tank - Clean water pumping station
-
Rinse water treatment plant
-
Chemical building
-
Central automation and control system (SCADA)